ProvinceBritish Columbia

What are you about to say yes to? › Land and buildings › British Columbia

Land and buildings · British Columbia

Buying land, a cottage or a farm in British Columbia

Before you buy land, a cottage, a farm or a commercial building in British Columbia: the farmland reserve, what's under the land and in front of it, and the records to search.

11 official pages, each read 17 November 2026

The answer to the card picked above, with its drawing and official pages. A full page opens in a new tab.

  1. In the Agricultural Land Reserve?

    Farmland? ALR the Agricultural Land Reserve, on the Commission's mapsSource: Agricultural Land CommissionSubdividing or another use? $1,500 an application to the CommissionSource: Agricultural Land Commission
    The reserve's line across the fields

    British Columbia

    • One home 1principal residence

      on most lots in the reserve; a second only in the conditions the rules set.

    • A home that doesn't fit the rules $900

      to apply for a non-adhering residential use, shared between the local government and the Commission.

    • Subdivide, a non-farm use, soil or fill $1,500

      each, to apply; $150 less where a notice of intent was filed first.

    • Into the reserve $0

      to apply to add land to the reserve.

    • A title may carry a note that the land is in the reserve, but the Commission says the note may not show its current or complete boundaries; its own maps show whether a property is in.
    • Uses other than farming need the rules' permission or the Commission's approval.

    Provincial Agricultural Land Commission: Buying and owning land in the ALR · Provincial Agricultural Land Commission: ALR maps · Provincial Agricultural Land Commission: Application process. Read 17 November 2026.

  2. Contaminated?

    $150 a Site Details Report; the search is freeSource: Government of BC
    The surface, the minerals, the records

    British Columbia

    $150 a Site Details Report from BC's Site Registry; searching it is free
    • The Site Registry holds the records of contaminated sites, sites under investigation or cleanup, and their certification documents, searched by parcel identifier, address or site ID.
    • Most private landowners in BC don't own the minerals under their land; a mineral title doesn't show on a title search, so the Province's mineral titles map shows any claim, and a charge on the title names who holds rights under the surface.
    • Wells drilled, changed or closed since 29 February 2016 are registered in the provincial well database within 90 days of the work; older wells may not be in it. Water for a household needs no licence; other uses of groundwater do.

    Government of British Columbia: Site information (updated 19 June 2026) · Government of British Columbia: Private property: frequently asked questions (mineral titles) (updated 25 March 2025) · Government of British Columbia: Well records and registration (updated 19 May 2026). Read 17 November 2026.

  3. A dock?

    $250 to apply where the general permission doesn't reachSource: Government of BC
    The lot, the foreshore, the dock

    British Columbia

    $250 the one-time fee to apply for a specific permission for a private dock
    • The Province owns nearly all the foreshore, between high and low water, in front of fresh and salt water, and the public keeps a right to get to it.
    • A private dock on the foreshore needs the Province's permission: a general permission applies when its terms are met (one dock a property, floating or on posts, no fill or dredging, public access kept, insurance), except in areas where every dock must apply.
    • Someone else applying for a dock in front of a property needs the upland owner's written consent.

    Government of British Columbia: Land use: private moorage (updated 17 March 2026). Read 17 November 2026.

  4. A commercial building?

    9 property classes BC Assessment usesSource: BC Assessment
    A building split between classes

    British Columbia

    9 property classes: residential, utilities, supportive housing, major and light industry, business and other, managed forest, recreational and non-profit, and farm
    • A building with more than one use is split between classes by value, a shop with a flat above it among them, and each municipality sets its own tax rate for each class.
    • The property transfer tax applies to land and buildings of every kind at 1%, 2% and 3%; the further 2% over $3 million is on the residential part only.

    BC Assessment: Understanding property classes and exemptions · Government of British Columbia: Property transfer tax (updated 3 December 2025). Read 17 November 2026.

  5. The registers to check

    5 registers: The ALR maps, The Site Registry, The provincial well database, A title search, BC Assessment's search
    The reserve, the records, the title
    • FarmlandThe ALR mapsProvincial Agricultural Land Commission

      Whether a property is in the Agricultural Land Reserve.

      No fee shown on its page
    • ContaminationThe Site RegistryGovernment of British Columbia (updated 19 June 2026)

      Records of contaminated and cleaned-up sites, by parcel or address.

      Search free; report $150
    • WellsThe provincial well databaseGovernment of British Columbia (updated 19 May 2026)

      The wells registered since 29 February 2016, and older ones where reported.

      No fee shown on its page
    • The titleA title searchLand Title and Survey Authority of British Columbia (fees as at 1 April 2026)

      The owner, the charges on the title, a reserve note or rights under the surface among them.

      $11.06 a search
    • The class and valueBC Assessment's searchBC Assessment

      The assessed value and the property's details.

      Free

    Each register's page above read 17 November 2026.

What to re-check, and when

The rules on this page change on these dates or schedules; the official page is the one to read again then.

  • 1 July 2026 and after New site remediation fees took effect 1 July 2026; the Site Registry's page was updated 19 June 2026. Government of British Columbia: Site information
  • Before you apply The Commission's application fees, on its application page. Provincial Agricultural Land Commission: Application process
  • Before a dock goes in Whether the area is one where every dock must apply; the private moorage page was updated 17 March 2026. Government of British Columbia: Land use: private moorage
  • Before a title search LTSA's fee list is dated 1 April 2026. Land Title and Survey Authority of British Columbia: Fees

For businesses

Own a business? Reach the people reading this page.

Reading nowBuying land, a cottage or a farm in British Columbia

Matched to this page
  • Land surveyors
  • Well water testing
  • Septic inspection and pumping

Your ad can sit in this space, in view beside the page while they read. From $14.99 for 90 days, paid once.

Advertise here

More on OfferDue

Official pages: each linked under its section above. Each page read 17 November 2026. Free to check yourself; each link opens the official page.

Public-record information, not legal advice. Each line says what the official page shows and links it; rules change, so the official page is the one to rely on. About OfferDue.